Nullam dignissim, ante scelerisque the is euismod fermentum odio sem semper the is erat, a feugiat leo urna eget eros. Duis Aenean a imperdiet risus.
1. Before shipment, slowly inflate the gasbag with nitrogen to 3.5 MPa and check for leaks.
2. Without deflating the gasbag, use a manual replenishing pump to pressurize the system with oil to 4.0 MPa. Before pressurization, remove the instruments to be shipped and test the joints and welds for leaks.
3. After successful pressurization, release the oil pressure and then adjust the nitrogen pressure in the accumulator to the pressure required by the drawings.
4. Before shipping and packing, drain all oil from the system and check that all required accessories are included.
5. This design has a pressure of 4.0 MPa, a design temperature of 180℃, and a heat exchange area of 0.4 m².
6. Accumulator pre-charge pressure: 2.5 MPa.
7. Before shipment, the support frame is painted silver-gray, and the tank body is sandblasted to a silver-gray finish.